The Mumbai Metropolitan Region Development Authority (MMRDA) is set to begin electrification work on Phase 1 of Mumbai Metro Line 9—from Dahisar East to Kashigaon—starting May 10, covering a nearly 5-kilometer stretch and four stations, confirmed an official.

Furthering a public notification has been issued warning citizens to stay cautious around this section of the route, as the metro overhead traction wires will be energized with 25,000 volts for the electrification process.

An MMRDA official stated that once the energization is complete, trial runs for the metro will commence. These trials are a critical step toward commissioning the line for public use, pending all required regulatory clearances.

Metro Line 9, an extension of Metro Line 7 (which connects Andheri East to Dahisar East), will ultimately run from Dahisar to Mira Bhayander, spanning 13.581 km—of which 11.386 km is elevated and 2.195 km underground—and will include 10 stations in total.

Once fully operational, the metro is expected to significantly ease travel in the western suburbs by reducing current commute times by 50% to 75%, depending on road conditions. It will also enhance connectivity between the Western Express Highway, the Western Railway, Metro Line 2A (Dahisar to D N Nagar), and Metro Line 7.

By 2031, the daily ridership on Metro Line 9 is projected to reach 11.12 lakh, positioning it as a major component of Mumbai’s expanding public transit network. 

Read more
FD Interest Rates Falling? Invest in This Post Office Scheme Instead—Check Returns on ₹1 Lakh to ₹5 Lakh Investment
Newspoint
India cuts coal imports by over 9% in FY25, saving USD 6.93 billion in forex
Newspoint
PSEB 12th Result 2025: Punjab Board 12th result pseb.ac.in today, you will be able to check marksheet like this..
Newspoint
CBSE Important Notice: Post-Result, CBSE Launches Tele-Counselling to Support Students' Mental Health
Newspoint
Last Chance to Apply for Assistant Engineer (Civil) Positions in Assam
Newspoint
Rajasthan Board Result 2025 Update: RBSE Class 10th Result Likely to Be Declared Before 12th, Check on rajresults.nic.in
Newspoint
Career: Do this course after 12th, you will have a great job in a short time, salary will be in lakhs..
Newspoint
Canadian businessman Maninder Sidhu appointed as International Trade Minister
Newspoint
‘Big Shoes To Fill’: James Anderson Hails Virat Kohli As One Of Test Cricket’s Greatest
Abplive
SEBI Proposes To Ease Compliance For FPIs Investing In Government Bonds
Abplive